Bord Gais Power Station
- Client: Bord Gais
- Project: Whitegate Power Station
- Value: €15m
- Programme: 9 months
H. A. O'Neil is carrying out the mechanical services installation on this 450MW HRSG (Heat Recovery Steam Generator). The project involves
- Heavy lift capacity on modules of 205 tonne
- Steam drum weight 125 tonne
- Erection of stack 7m diameter and 62m high
- Erection and welding of all casing panels
- 500 tonne of main steel erection
- 2600 tonne of equipment installation
- 625 tonne of pipe installation